Monday, November 14, 2016

BURGEN PROJECT - November 2016 Bathroom Remodel - Beverlywood, CA

Burgen Project - Full Bathroom Remodel

The clients in this project had a dated upstairs bathroom that they wanted to update.

The interior of the existing bathroom was excavated down to the framing to include all walls, cabinets, tile, bath tub, ceiling and the floorr.

Here are the "before" and "after" photos of the project.  Note:  To expand any photo, place your cursor over the desired picture and double click the image.  That will enlarge it accordingly.




(Before) - A view of the existing bathroom that was completely remodeled.



(After) - New travertine floor tile, tiled vanity cabinets, new sink & fixtures, mirror, lighting, ceiling vent fan, heater  & light unit, recessed lighting in the ceiling.  The, shower was re-framed for the new configuration. New shower tile throughout, and glass shower door.   



(After)


(Before) photo of the bathroom prior to the remodel.


(After) - New custom vanity cabinets, counter top tile, sink, mirrors, lighting.


(After) - The shower was made larger and redesigned.  New floor to ceiling tile, niche' added, rock tile floor tile, and glass door and enclosure.


(Before) - Shower stall, tile and door with electric wall heater.  Carpet flooring was removed and  replaced with tile.


After - 


After - 


(Before) - The existing tub was removed allowing for more space and additional storage with the redesign of the vanity.