Complete remodel of residential home, adding additional separate living structure.

This was a complex remodeling project requiring a large volume of calculations for new foundation and concrete support throughout the front and back house due to the custom architectural design requested by the clients.


Remodeling completed



Original home prior to construction


Backyard prior to construction



Demolition of the interior of the home, removing walls, etc. for a more open concept view



Demolition at the rear of the house


Backyard completely cleared to make way for additional ADU, (Accessory Dwelling Unit) 
pouring a complete new cement foundation, running electrical, water and new sewage lines


Framing begins - Reconfigured new roof lines, new interior walls, etc.



Open Concept Looking from Front of House to Rear.  Note ADU in the rear area.



Framing open concept dinning room, kitchen and den.  No separating walls.


Adding additional square footage to the original structure's footprint required new foundations


 New Accessory Dwelling Unit (ADU)  added in the rear yard


Next Stucco and interior drywall


New folding patio doors opening to the backyard


Overall view of property after exterior stucco was applied


Overall Look of Property Upon Completion



Walk through Video of finished great room


Open concept - Dinning room, Kitchen and Den


Kitchen completed - Massive Island



Walk through folding patio doors to rear yard and entrance to ADU



Video showing entrance from the rear patio area


Completed ADU - rear of property





Overall view of the front house and patio areas.

Wednesday, February 15, 2017

MOTOR AVE PROJECT - January 2017 - Complete Bathroom Remodel

Motor Avenue Project - Bathroom Remodel

Client request a complete remodeling of there upstairs bathroom.

Photographs will show both the "before" and "after" view of the bathroom project.
To enlarge the size of any photo, place your cursor over the photo desired and double click the mouse.  The photo will expand accordingly.



(Before) - Existing bath tub 



(After) - New bath tub and configuration.  Note new tile floor as well.



(Before) - Shower stall.



(After) - Larger shower created with new tile finishes, glass surround & door.



(Before) - Entrance to the bathroom - note vanity along the right wall



(After) - New flooring, ceiling recessed lights, flooring, paint and vanity with quartz counter top 



(Before) - Old Vanity and lighting.  All removed and remodeled.



(After) - New custom vanity cabinet, quartz counter top, mirrors and lighting.





Monday, November 14, 2016

BURGEN PROJECT - November 2016 Bathroom Remodel - Beverlywood, CA

Burgen Project - Full Bathroom Remodel

The clients in this project had a dated upstairs bathroom that they wanted to update.

The interior of the existing bathroom was excavated down to the framing to include all walls, cabinets, tile, bath tub, ceiling and the floorr.

Here are the "before" and "after" photos of the project.  Note:  To expand any photo, place your cursor over the desired picture and double click the image.  That will enlarge it accordingly.




(Before) - A view of the existing bathroom that was completely remodeled.



(After) - New travertine floor tile, tiled vanity cabinets, new sink & fixtures, mirror, lighting, ceiling vent fan, heater  & light unit, recessed lighting in the ceiling.  The, shower was re-framed for the new configuration. New shower tile throughout, and glass shower door.   



(After)


(Before) photo of the bathroom prior to the remodel.


(After) - New custom vanity cabinets, counter top tile, sink, mirrors, lighting.


(After) - The shower was made larger and redesigned.  New floor to ceiling tile, niche' added, rock tile floor tile, and glass door and enclosure.


(Before) - Shower stall, tile and door with electric wall heater.  Carpet flooring was removed and  replaced with tile.


After - 


After - 


(Before) - The existing tub was removed allowing for more space and additional storage with the redesign of the vanity.  


Wednesday, May 7, 2014

Westlawn Project - 2014 Total Home Remodel - Mar Vista, CA


WESTLAWN REMODEL PROJECT


In January 2014, THB Construction initiated a home remodeling project of a late 1940's two story residence in Mar Vista, CA.  

As the project unfolded, several hidden structural and leaking roof problems came to light.  With the approval of the clients, all of these issues and concerns were appropriately addressed and corrected, returning the home to its former sound structure.

The entire home, garage/patio and landscape was remodeled in one form or another as you will note in the "before & after photographs".

This project was a complete makeover that addressed, updated, restored or replaced significant portions of the home.

The 1st level bathroom was reconfigured and expanded for more appropriate space that allowed for a grander new bathtub and shower stall.  The 2nd level bathroom was also updated with new tile and glass enclosures.

The laundry room had an inadequate plumbing system was revised and updated, bringing it up to code, making it more efficient and safe.

The entire kitchen was revamped, removing all existing flooring, cabinets, existing plumbing and appliances.  This included a redesign of the laundry room as well.  New cabinets were installed and new appliances and tile flooring were added.  Recessed ceiling lights with new electrical circuits installed.  New kitchen sink, faucet & garbage disposal were added.

Due to improper installation of the previous roofing material, a large degree of water damage to the roof sheeting had to be replaced.  All old plywood sheeting was removed and new sheeting and framing around the eves was done.  New shingles and drip edge and flashing were also installed.  A complete was now in place.

All existing windows were removed and replaced with high energy efficiency double pain windows.  

The pack patio cover was rotten and removed.  A new atrium was added with the addition of outside receptacles and lighting.

The electrical circuitry was extremely inadequate and was subsequently upgraded including the addition of a new power panel and new circuitry for the house and a sub-panel for the garage.

New recessed ceiling lights were added throughout as well as upgrading the power receptacles, GFI’s, vent/heating in the bathrooms and general overall lighting throughout.

Additionally, a sophisticated security camera/wi-fi system was installed so that the clients could monitor their home from anywhere – remotely with a smart phone or iPad/Tablet device.

The entire house was painted inside and out.  All existing cabinets and paneling was stained according to the clients wishes.

The following series of photographs will show “before” images of the areas addressed as well as photographs of the finished “after” product.  To expand any photo, place your cursor on it and double click the image.



 Westlawn Property
 Completion of the Remodel
 Living Room Fire Place & Book Shelves
Hardwood Floors re-surfaced, stained and sealed  - New Gas Line installed in the fireplace.
Living Room front window.  Front door replaced.  Hardwood floors refinished.  Side window replaced

New Front Door, ceiling recessed lights and security camera system installed
 

 Book case refinished and new cabinet doors installed.  Accent recessed lighting in ceiling.  
 Dinning Room with walkway to the kitchen
 Dinning Room paneling re-stained, floors sanded, stained and finished.  New front window
 Dinning Rooom walk through to bathroom and hallway staircase.
Carpet removed from hallway and replaced with new hardwood flooring
 Stair case to 2nd floor
 Carpet removed, new wood stair treads stained & finished.  Raisers painted.
 Kitchen
 Kitchen completely remodeled with new cabinets, tile floor, recessed lights & cabinets -
New appliances, paint,tile back splash, etc.  
 Kitchen/Dinette area
New Kitchen cabinets, under cabinet lighting, granite counter top, new window, floor tile, 
floor molding and paint.
 Another view of the kitchen - "before" - Note location of the stove.
 Refrigerator in new location. Prior walk through removed to open the space.
 Back door moved to where back side window is located.  
 New kitchen window, sink and appliances & cabinets.
 Attached laundry room to the kitchen area
New window, sink and cabinets, new water and drain service, tile floor and ceiling lights.
 Side window removed for new location of side door.
 New side door where once was a window.
 Open kitchen pantry shelves
 On the left, new cabinets for the pantry
 Lower office/bedroom
New door, door frames, hardwood floors stained and refinished
 Office/Bedroom area
 New window installed
 1st level bathroom - very narrow
 Re-framed south wall to expand the bathroom.  New windows, cabinets, floor tile, lighting and vent
Created larger bath tub area and shower stall
New expanded stall shower with glass enclosures & accent tile added
 New bath tub and tile installed
 New vanity, sink and toilet, mirror and lighting
 2nd floor bedroom
 New window, paint, floor molding, carpet and ceiling fan
 Stairwell - re-finished beams, new light fixture
 Stairwell
 2nd floor bonus room.
 New windows, recessed lighting, carpet, floor molding and paint
 Southern view of the bonus room
 Completed with new lighting, carpet, paint, trim and windows.
 2nd floor bathroom
new granite vanity counter top, sink and skylight previously rotted from leaking rain.
 2nd Floor bath tub
 New bath tub, glass enclosure, tile with accent pieces and flooring
 2nd Floor powder room
 New granite vanity counter top, sink, mirror, light bar
 Side door, window and hot water heater - illegal wooden shed (fire hazard)
Side door relocated, window removed and proper metal hot water enclosure installed 
 Garage and attached patio
 Garage painted and upgraded with electrical panel to support the patio
 Patio area
 Added new awning, lighting and outlets and side access door into the garage.  Painted same.
New Patio Area
 Rear of garage and patio area
Finished garage and patio area.
 Front of house - new roof, rain gutters, front porch area, expanded driveway width and landscaping.